SIERRA LEONE

Function: Urbanism & Airport
Build up Area: 57 600 sq.m.
Location: Aberdeen, Sierra Leone.
Date: 2024
Construction Cost: 51 184 000 $

Status: Preliminary design

Concept

The General Master Plan was
conceived from the general
topography of the land.